Course Details
Metal Bridges 2 (KON)
Academic Year 2025/26
NOB028 course is part of 1 study plan
NPC-SIK Summer Semester 1st year
Course Guarantor
Institute
Language of instruction
Czech
Credits
5 credits
Semester
summer
Forms and criteria of assessment
course-unit credit and examination
Offered to foreign students
Not to offer
Course on BUT site
Lecture
13 weeks, 2 hours/week, elective
Syllabus
- 1. Composite steel-concrete bridges – loads, beams in the plastic behaviour (basis of static design), influence of the method of erection, short-term and long-term effects).
- 2. Composite steel-concrete bridges – beams in the plastic behaviour (principles of static design).
- 3. Composite steel-concrete bridges – shear connections (types, structural detailing, basis of design).
- 4. Box girder bridges – specific properties of box girder bridges, basis od static design, torsion of box girder bridges.
- 5. Arch bridges – types of arch bridges, structural composition, basic principles of static and structural design.
- 6. Arch bridges – specialties of structural design, frame bridges.
- 7. Skewed bridges – basis of structural composition, basis of static design.
- 8. Curved bridges – basis of structural composition, bysis of ststic design.
- 9. Suspension and cable-stayed bridges – principles of structural composition, material and structural members.
- 10. Suspension and cable-stayed bridges – basis of static design.
- 11. Steel and composite steel-concrete bridge supports – types, structural static design.
- 12. Special bridges – temporary bridges, movable bridges, floated bridges (basic information).
- 13. Manufacture and erection of metal bridge structures, examples of realized metal bridges, practical aspects of the design.
Exercise
13 weeks, 2 hours/week, compulsory
Syllabus
- 1. Individual task of a project, basic information and requirements for an elaboration.
- 2. Structural composition of steel bridge with truss or arch main girders (in dependence on the individual task).
- 3.–5. Static and structural design of the bridge deck (in dependence on the individual task).
- 6.–9. Static and structural design of main girders (in dependence on the individual task).
- 10.–11. Static and structural design of bridge bracings (in dependence on the individual task).
- 12.–13. Elaboration of drawing documentation, project completion.