Course Details
Railway Stations and Junctions 1 (DST)
Academic Year 2025/26
NNB010 course is part of 1 study plan
NPC-SIK Summer Semester 1st year
Course Guarantor
Institute
Language of instruction
Czech
Credits
5 credits
Semester
summer
Forms and criteria of assessment
course-unit credit and examination
Offered to foreign students
Not to offer
Course on BUT site
Lecture
13 weeks, 2 hours/week, elective
Syllabus
- 1. Operating control points and open track, basic terms. Division of operating control points, a division of railway stations according to the position in railway network. Tracks in railway stations, tracks numeration, symbols of tracks, track length, distances of track centre lines.
- 2. Basic transport regulations, train diagram, train schedule of railway stations. Time diagram of station operation, track occupation diagram, operating efficiency, making up of trains.
- 3. Railway stations – railhead, intermediate.
- 4. Railway stations – connection and junction.
- 5. Railway junctions, transit and exchange railway stations.
- 6. Track alignment design parameters in control operation points and other operation points
- 7. Railway superstructure, substructure and its drainage in railway stations
- 8. Construction of platforms, pedestrian subways and footbridges.
- 9. Platform requirements.
- 10. Platforms for persons with reduced mobility r
- 11. Railway stops, passing sidings, branching points, junctions.
- 12. Station buildings and reception area.
- 13. Equipment for loading and unloading of goods, goods depots, ramps, service roads. Goods stations.
Exercise
13 weeks, 2 hours/week, compulsory
Syllabus
- 1. Specifying of the first project, guidelines to draw up.
- 2. Guidelines to horizontal and vertical alignment in a station.
- 3. Format and content of drawings – setting out a drawing, longitudinal profile.
- 4. Submitting of the first project, specifying of the second project.
- 5. Changes of track axes distances, station scheme.
- 6. Design of railway substructure in a railway station.
- 7. Format and content of drawings – the situation of the railway station.
- 8. Platforms, ramps.
- 9. Technical report.
- 10.–12. Consultation of projects.
- 13. Submitting of the second projects, credit.