Course Details
Static at Reconstructions (S)
Academic Year 2025/26
NLB024 course is part of 1 study plan
NPC-SIS Summer Semester 1st year
Course Guarantor
Institute
Language of instruction
Czech
Credits
4 credits
Semester
summer
Forms and criteria of assessment
course-unit credit and examination
Offered to foreign students
Not to offer
Course on BUT site
Lecture
13 weeks, 2 hours/week, elective
Syllabus
- 1. Structure serviceability. Faults sources – monitoring and possibilities of their reduction.
- 2. Method of diagnostic investigation of concrete and masonry structures.
- 3. Definition and methods of load-bearing capacity determination of concrete and masonry structures. Preparation, extent and methods of loading tests.
- 4. Conditions for realisation of reconstructions from the structural viewpoint. Methods of strengthening.
- 5. Methods of strengthening of concrete structures.
- 6. Methods of strengthening of masonry structures.
- 7. Strengthening of structures with free prestressing reinforcement – prestressing, injection and guniting, structural analysis.
- 8. Strengthening of structures with incoherent prestressing reinforcement – structural solution and analysis.
- 9.–10. Strengthening and reconstruction of structures using concrete, steel and timber.
- 11. Foundation reconstructions.
- 12. Structural solution of buildings extensions, superstructures and buildings-in.
- 13. Temporary provision of structures at reconstructions. Deformation of strengthened structures and its monitoring. Mortal improvement by injection. Application of glued carbon fibres.
Exercise
13 weeks, 2 hours/week, compulsory
Syllabus
- 1.–2. Strengthening of compressed members: Strengthening of masonry column with steel plates.
- 3.–4. Strengthening of masonry column with concrete envelope. Checking.
- 5.–6. Strengthening of concrete members subjected to bending moment: Strengthening using additional reinforcement and concrete envelope.
- 7.–8. Strengthening with carbon fibre reinforced polymers (CFRP).
- 9.–10. Strengthening with post-tensioning. Checking.
- 11.–12. Strengthening of timber floor structure: Reinforced concrete (RC) slab. Calculation of deflection.
- 13. Design submission. Credit.