Course Details
Heating
Academic Year 2025/26
BTA014 course is part of 1 study plan
BPC-EVB Summer Semester 2nd year
Course Guarantor
Institute
Language of instruction
Czech
Credits
5 credits
Semester
summer
Forms and criteria of assessment
course-unit credit and examination
Offered to foreign students
Not to offer
Course on BUT site
Lecture
13 weeks, 2 hours/week, elective
Syllabus
- 1. Hygrothermal indoor climate and conditions for thermal comfort. Heat transportation theory. Concept of ventilation and heating buildings.
- 2. Method for calculation of the design heat load.
- 3. Heating systems and their parts. Divisions and principals of technical solution of heating systems.
- 4. Heating surfaces. Convective radiators. Floor heating und wall heating.
- 5. Basic kinds of fuels and energy. Energy sources. Solid fuel boiler rooms.
- 6. Gas boiler rooms. Chimneys and smoke - flues.
- 7. Central preparation of hot domestic water. Elements in boiler rooms and engine rooms.
- 8. Safety devices for heating systems.
- 9. Hydraulics and sizing of central heating systems, regulation fittings and circulation pumps.
- 10. Centralized distribution of heat, house station.
- 11. Direct electric heating and accumulation heating.
- 12. Heating systems method regulation in buildings.
- 13. The use of renewable and alternative energy sources and their impact on the classification of buildings.
Exercise
13 weeks, 2 hours/week, compulsory
Syllabus
- 1. Overall heat transfer coefficient building construction, preparing of blind matrix for drawing.
- 2. Average coefficient of heat transfer, its evaluation, preliminary calculation of heat loss.
- 3. Heat losses of individual rooms specified object.
- 4. The dings of radiators, drawing of the floor plan, nominal and real performance of radiators.
- 5. Pipeline systems in the floor plan, connection scheme of radiators.
- 6. Design of heat source for family house and its location. Solution air inlet and flue gas. Diagram of the boilers.
- 7. Design of piping distribution system and design of circulation pump. Heat and fuel consumption. Technical report.
- 8. Central domestic water preparation.
- 9. Gas boiler room to 500 kW - equipment design and layout.
- 10. Safety devices for heating systems.
- 11. Boiler room ventilation. The connection scheme for boiler room up to 500 kW.
- 12.-13. Diagram of connection of transfer station.