Course Details
Mechanization and Realization of Railway Structures
Academic Year 2025/26
BNB005 course is part of 1 study plan
BPC-SI / K Summer Semester 4th year
Course Guarantor
Institute
Language of instruction
Czech
Credits
4 credits
Semester
summer
Forms and criteria of assessment
course-unit credit and examination
Offered to foreign students
Not to offer
Course on BUT site
Lecture
13 weeks, 2 hours/week, elective
Syllabus
- 1. Hand-held equipment for maintenance of rails, sleepers, rail fastening, justification geometry components and track alignment, other hand-held equipment.
- 2. Ballast cleaners.
- 3. Geometry deterioration, reasons and remedial actions (tamping machines).
- 4. Ballast regulators, compacting machines for ballast bed and dynamic track stabilizers.
- 5.Machines for sleeper and rail replacing.
- 6. Track and switches and crossing panels laying, removal and replacement.
- 7. Welding machines and continuously welded rail laying.
- 8. Renewal of rail microgeometry.
- 9. Organization of track maintenance and possessions.
- 10. Machines for maintenance and renewal of railway substructure.
- 11. Measuring and diagnostic systems.
Exercise
13 weeks, 2 hours/week, compulsory
Syllabus
- 1. Special vehicles for person transport and material transport. Machines for removing of snow and vegetation.
- 2. Ballast cleaners.
- 3. Geometry deterioration, reasons and remedial actions (tamping machines).
- 4. Ballast regulators, compacting machines for ballast bed and dynamic track stabilizers.
- 5.Machines for sleeper and rail replacing.
- 6. Track and switches and crossing panels laying, removal and replacement.
- 7. Welding machines and continuous welded rail laying.
- 8. Renewal of rail microgeometry.
- 9. Organization of track maintenance and possessions.
- 10. Machines for maintenance and renewal of railway substructure.
- 11. Measuring and diagnostic systems.