Course Details
Technology of constructions 2
Academic Year 2024/25
NWA033 course is part of 1 study plan
NPC-ARS / ARA Winter Semester 2nd year
Course Guarantor
Institute
Language of instruction
Czech
Credits
4 credits
Semester
winter
Forms and criteria of assessment
course-unit credit and examination
Offered to foreign students
Not to offer
Course on BUT site
Lecture
13 weeks, 2 hours/week, elective
Syllabus
1. Assembly processes. Principles of production, transportation and storing of semi-products. Assembly of buildings of reinforced concrete semi-products. Readiness of the site for assembly. Assembly procedures, cranes, optimisation of their selection. Quality requirements for assembled structures.
2. Assembly of steel structures. Production of structural elements, principles of haulage and storage. Readiness of the site for assembly, pre-assembly areas. Optimisation of assembly methods and procedures. Requirements for quality and accuracy of assembled structures.
3. Introduction into the sphere of inner and finishing processes, their analysis, demands, technology level. Sequence of individual processes, links, necessary technology breaks.
4. Principles of partitions execution – masonry, made of glass blocks and assembled of segments and skeletal. Readiness of construction, flow-charts, tests, quality control.
5. Installation processes. Establishment of inner sewage system. Water and central heating distributions. Installation of inner gas duct and air handling distributions. Systems, material options, readiness of construction, assembly processes, principles of connecting.
6. Execution of building water, heat, noise, vibration insulations and insulations against chemical impacts. Flow-charts, readiness of constructions, links, quality control, tests.
7. Assemblies of opening fillings – windows, door panels, locksmith product packing, built-in furniture panels etc. Readiness of construction, working procedures, types of anchoring. Quality requirements.
8. Building structure surface treatment – interior plasterwork and external coatings, types, flow-charts, readiness of the background, technology breaks, flatness requirements, quality inspection.
9. Technology of contact warm padding building claddings, systems, flow-charts. Background preparation, principles of execution of thin-coat reinforcement plasters. Quality conditions.
10. Execution of interior and external linings, systems, technology procedures, requirements for construction readiness. Contact and grid linings. Quality requirements, quality inspection method.
11. Establishment of ceiling soffits. Systems, readiness of the base, technology procedures. Time demand. Flatness requirements and their inspection.
12.Laying of floors and paving. Types, material options. Working procedures, requirements for technology breaks. Quality requirements and their inspection.
13. Paintings and wall, timber and steel structure coatings. Types of painting and coating materials, their classification and applicability. Requirements for the base, application method, quality inspection.
Completing of craft works, installation of fittings, fixing technology. Test and inspection reports, necessary inspections for the final building acceptance.
Exercise
13 weeks, 2 hours/week, compulsory
Syllabus
1. Organizational instructions, Individual tasks of solved buildings as for assembly works and finishing works, outline of the link to the preceding subject Technology of constructions I. introduction to the processes of assembly works
Outcome: selection of a building for exercise practice, arrangement of the required constructional drawings, establishment of a template for the following development of Technological Regulations, calculation of the weight of the elements of the assembled building.
2. Processes of the assembly works, selection of tools
Outcome: Technological regulation for the assembly, design of a crane or autocrane, technical documentation of the machines, load verification in load tests, assembly schemas
3. Design of a site plant for an assembled building
Outcome: The drawing of the building site in colours, with the location of the lifting gear, and detailed drawing of stored elements
4. Partitions
Outcome: Technological regulation for the selected partition including the design of scaffolding and tools, plan schema with the details of the different types of partitions in the building layout, details
5. Insulation
Outcome: Technological regulation for the selected insulation assembly including a design of possible tools, cross-section of the assembly, high-risk details, especially connection or anchorage of the insulating material
6. Educational trip to a selected construction to have a chance to watch the assembly works and the process of lifting gear.
7. Check of the outcomes from the required parts, the principles of assembly of opening filling
8. Plastering – Part I.
Outcome: Technological regulation for application of a selected plater emphasizing the selection of site supply (hand or machine application), drawings: plan, section of one floor with representation of the plastering process, scaffolding placement, defining of the work progress
9. Plastering – Part II.
Outcome: progress schedule for plastering, sequenced by rooms, with a division of the first and second height of plastering, ceiling and specifying the technological breaks
10. Floors – Part I.
Outcome: Drawing – plan with marking of the types of surface layers in each room, suitable selection of material
11. Floors – Part II.
Outcome: Technological regulation for selected types of flooring including a design of possible tools, cross-section of the flooring composition, high-risk details
12. Final consultation, educational trip to a selected construction to have a look at the technology of the finishing works
13. Credit test