Course Details
Selected Problems of Design and Realization of Metal and Timber Structures and Bridges (KON)
Academic Year 2024/25
CO052 course is not part of any programme in the faculty
Course Guarantor
Institute
Language of instruction
Czech
Credits
5 credits
Semester
summer
Forms and criteria of assessment
course-unit credit and examination
Offered to foreign students
Not to offer
Course on BUT site
Lecture
13 weeks, 2 hours/week, elective
Syllabus
1. Introduction to the study of the course. Experimental verification of members and components of metal and timber structures - possibilities of experiments realization, types of the tests, test results.
2.-3. Statistical elaboration of experimental data obtained from the loading tests.
4.-5. Probabilistic evaluation of test results - design assisted by testing.
6. Terminology, classification, requirements, characteristic of temporary bridge structures.
7. Basic systems of steel temporary bridges - web-plated and truss temporary bridges.
8. Mobile steel bridges. Temporary timber bridge structures.
9.-12. Selected topics of the design of advanced timber structures - spatial timber structures, timber structures combined of various materials, connections of modern timber structures.
13. Failures and reconstructions of metal and timber structures and bridges.
Exercise
13 weeks, 2 hours/week, compulsory
Syllabus
1. Examples of experimental verification of steel, composite steel-concrete and timber structural members and components - presentation of loading tests, examples of experimental data obtained from the tests, character and types of test results.
2.-3. Statistical elaboration of experimental data obtained from the loading tests: training using the sets of material tests results - determination of physical mechanical properties of steel, concrete, glass-fibre-concrete, structural glass.
4.-6. Probabilistic evaluation of test results: training using the sets of loading tests results - determination of the design resistance of steel and steel-concrete columns, thin-walled steel beams, timber beams strengthened by external bonded FRP reinforcement.
7.-8. Temporary bridges: examples of the design of modern temporary structures - presentation of the results of static and structural design of steel temporary footbridge.
9.-12. Selected topics of the design of advanced timber structures: examples of the design of selected members and connections of timber structures.
13. Calculation of the load-ability of steel railway bridge.