Course Details

Railway Stations and Junctions 1 (DST)

Academic Year 2024/25

CN054 course is not part of any programme in the faculty

Course Guarantor

Institute

Language of instruction

Czech

Credits

5 credits

Semester

summer

Forms and criteria of assessment

course-unit credit and examination

Offered to foreign students

Not to offer

Course on BUT site

Lecture

13 weeks, 2 hours/week, elective

Syllabus

1. Operating control points and open track, basic terms. Division of operating control points, division of railway stations according position in railway network. 2. Tracks in railway stations, tracks numeration, symbols of tracks, track length, distances of track centre lines. 3. Railway stations – railhead, intermediate. 4. Railway stations – connection and junction. 5. Railway junctions, transit and exchange railway stations, transhipment stations. 6. Track alignment design parameters in control operation points and other operation points 7. Railway superstructure, substructure and its drainage in railway stations 8. Equipment for passenger and baggage transport, platforms, pedestrian subways and foot bridges. 9. Station buildings and reception area. 10. Equipment for loading and unloading of goods, goods depots, ramps, service roads. 11. Goods stations, container terminals. 12. Railway stops, passing sidings, branching points, junctions. 13. Basic transport regulations, train diagram, train schedule of railway stations. Time diagram of station operation, track occupation diagram, operating efficiency, making up of trains.

Exercise

13 weeks, 2 hours/week, compulsory

Syllabus

1. Specifying of the first project, guidelines to draw up. 2. Guidelines to horizontal and vertical alignment in station. 3. Format and content of drawings – setting out drawing, longitudinal profile. 4. Submitting of the first project, specifying of the second project. 5. Changes of track axes distances, station scheme. 6. Design of railway substructure in railway station. 7. Format and content of drawings – situation of railway station. 8. Platforms, ramps. 9. Technical report 10. – 12. Consultation of projects. 13. Submitting of the second projects, credit.