Course Details
Hydro Power Utilization
Academic Year 2024/25
BRB009 course is part of 1 study plan
BPC-SI / V Summer Semester 4th year
Course Guarantor
Institute
Language of instruction
Czech
Credits
6 credits
Semester
summer
Forms and criteria of assessment
course-unit credit and examination
Offered to foreign students
Not to offer
Course on BUT site
Lecture
13 weeks, 2 hours/week, elective
Syllabus
1. Energy sources. Stream water power – potential resources. Theoretical, technically applicable hydropower potential of the stream.
2. Natural, artificial, primary and secondary sources of waterpower. Basic types of hydropower structures and their components. Structure of energy plants in Czech republic. Development of energetics in Czech republic.
3. Hydro power plants division. Hydro power cascades. Efficiency of of water source.
4. Work and function of water power plant in electric network – loading diagram.
5. Hydro-energetic solution of the run-off river hydro power plant.
6. Classification and typed of water turbines. Kaplan, Francise and Pelton turbines.
7. Spiral casing of water turbines. Suction pipes of water turbines. Suction head. Cavitation.
8. Intake structures of pressureless and pressure hydropower structures. Rules of design and types of intake structures. Solution of foreground of intakes, skimmer walls. Pipe lines of hydro power plants. Design of profiles of water power canals and pressure pipes.
9. Direct and indirect hydraulic shock. Compensating chambers, their function and types.
10. Constructional part of hydro power plant. Buildings of hydro power plant - types of engine room according to construction and placement. Complete spatial solution. Substructure of engine room – function, basic types of engine set supporting systems. Upper part of the engine room – function, construction types.
11. Excursion in hydraulic laboratory of Faculty of Mechanical Engineering Brno University of Technology is realized.
Exercise
13 weeks, 3 hours/week, compulsory
Syllabus
1.–2. Hydroenergetic solution of constant load hydro power plant on the basis of hydrological data and terrain morphology.
3.–4. Choosing of the right type of turbines, number of turbines, vertical location of, suction head.
5.–7. The layout of the water power plant.
8. Location and shape of the turbine or pipe intake and draught tube.
9. Design of lifting and handling equipment of the hydro power plant.
10. Generator solving, measurement and control of the non-electric values.
11. Quantities statement of construction and technological design.